Lorem ipsum dolor sit amet, consectetur adipiscing elit. Vestibulum eget ante tristique, finibus tortor et, posuere quam. Duis purus risus, pharetra nec lacinia ut, vehicula et nisl. Etiam a ornare est. Mauris sit amet nisl vitae eros ornare fringilla. Donec ut vulputate nibh. Sed luctus auctor dui, non iaculis elit fringilla in. Duis quis magna tempor elit tristique sagittis ut in turpis. Mauris quis orci interdum, dictum erat nec, gravida nisi. Suspendisse vel lorem arcu.
Video Golden Brilliant to EMO terminal, Mississippihaven in Port of Rotterdam
published on 2 September 2020
Today, the MV GOLDEN BRILLIANT, a 225 m long bulk carrier came in at sunrise, underway to EMO terminal, Mississippihaven in Port of Rotterdam. We were assisted by two tugboats, the BUGSIER 12 and MULTRATUG 3. It was cold and very windy, but the Philippino crew dit an outstanding job! The only way to say goodbye these days is the much acclaimed “ Corona Handshake” to master and crew.
Opinion Example of a passage and berthing plan
by Marine-Pilots.com - published on 19 June 2020
Article ADNOC L&S Signs 25-year Agreement to Service All Petroleum Ports in Abu Dhabi
published on 30 September 2020
ADNOC Logistics and Services (ADNOC L&S), the shipping and maritime logistics subsidiary of the Abu Dhabi National Oil Company (ADNOC), announced today that it has signed a new 25-year agreement to provide critical marine services across all Petroleum Ports in Abu Dhabi on behalf of the Petroleum Ports Authority (PPA). This includes the onshore Jebel Dhanna Ruwais Petroleum Port and the offshore Das Island, Zirku Island and Mubarraz Petroleum Ports in the Emirate of Abu Dhabi.
Article National Transportation Safety Board Releases Report Detailing 2018 Allision At Louisiana’s Sunshine Bridge
published on 13 August 2020
On October 11, 2018, the Kristin Alexis was performing fleeting work with a crew of six, including a captain, pilot, and four deckhands (two per shift), at the Cooper Consolidated fleeting facility at Convent located at mile 161.5. About 2300, the Cooper Consolidated dispatcher informed the Kristin Alexis captain that their next job was to move the derrick-type crane barge Mr Ervin upriver to the Cooper Consolidated fleeting facility in Darrow, located at mile 175.
Article Salt water runs deep in veins of Esperance marine pilot
by Carwyn Monck - published on 14 February 2024
Article NTSB investigation: Higher speed contributes to contact of tow with bridge
published on 14 December 2020
NTSB issued an investigation report on the contact of tow William C with a Rock Island railroad bridge protection cell, on Des Plaines River, in January 2020. The investigation established that high speed prevented the pilot to correct the tow’s position after completing the transit through the previous bridge.