Article SVITZER STRENGTHENS OPERATIONS IN AFRICA WITH NEW CONTRACT WINS
by Marine-Pilots.com - published on 8 June 2020
Recently, Svitzer took an important step towards strengthening its presence in Africa by signing a five-year contract with Nacala Logistics in Mozambique for harbour towage, occasional pilot transfer and potential salvage work in the port of Nacala. At the same time, Svitzer also secured a five-year extension of its current contract with Egyptian LNG assisting the land-based Idku LNG plant with four tugs, two mooring boats and one pilot boat.
Video CMMI Chennai Chapter |Technical Meeting | BRM During Pilotage
published on 27 July 2021
Video OMC International - Suezmax Tanker - Case Study
published on 14 October 2019
Video Learn more about MITAGS
published on 15 November 2019
Video Next Generation ECDIS
published on 2 November 2020
Video What is the impact of lateral resistance on a ship's turning circle??
published on 3 September 2020
This video explains the impact of lateral resistance on the turning circle of a vessel using animations. The video explains the term lateral resistance, shows an example of its impact on the turning circle and its associated aspects (advance, transfer, tactical diameter and drift angle).
Contents of this video will benefit mariners preparing for exams (written and oral examinations).
Video ENTRE TERRE ET MER - Le pilotage maritime
published on 7 June 2021
La Nouvelle-Calédonie, notamment la Grande Terre, a la particularité d'être complètement entourée par un lagon, seules quelques passes rendent son accès possible aux navires venant de l'étranger. La navigation maritime y est délicate car une bonne connaissance de la topologie des fonds sous-marins est indispensable. Tous les bateaux de commerces de plus de 60 m voulant accoster en Nouvelle-Calédonie doivent impérativement faire appel aux services des pilotes maritimes de Nouvelle-Calédonie,...
Video Pilot Boat
published on 10 August 2023
Cost: £600k Built in 2007 Current Owners: Milford Haven Port Authority Outline build design: Camarc Ltd Built by: Mainstay Marine Solutions Ltd Dimensions Length OA (inc fender). 19.75 metres Length (moulded) 18.65 metres Length Waterline 17.00 metres Beam OA (inc fender) 5.70 metres Beam (moulded) 5.25 metres Draught (approx) 1.50 metres Particulars: Min service life: 15 years. Vessel impacts: 1000 impacts per annum Significant wave height: 5m Typical duty cycle: 1000-3000 hour per year....