Article

Improving Teams Performance in Pilotage Waters


by Herman Broers - published on 31 March 2022 266 -

Introduction

This paper aims to explore the possibilities of improving team performance on the bridge in pilotage waters. In Bridge Resource Management, the integration of the pilot in the bridge team is an issue open to discussion. In this paper, the pilot will NOT be considered part of the bridge team for several reasons: He is not familiar with the bridge layout, nor is he familiar with the bridge team. Finally, the formal (legal) framework is much different for a pilot than for the captain, officers, and crew of a ship. However, this does not stand in the way of a successful collaboration. The pilot and the bridge team have a common goal: to navigate the ship safely and smoothly.  With the introduction of the term NAVteam, the actual course of events onboard is outlined as it is in practice in pilotage waters. This also opens the possibility of adding the other teams involved in navigating the ship, such as linesmen, port authorities and tugs. They all share the common goal. From the architecture of this multi-team, recommendations are made for optimal functioning by means of a so-called team Effectiveness model.  

The NAV-team

The team involved in navigating a ship will be called NAV-team. A general definition of a team is: A group of people with different skills and different tasks, who work together on a common project, service, or goal with a meshing of functions and mutual support (washington.edu, 2021),P.1.  The goal of the NAVteam can be formulated as follows: “To navigate the ship safely and smoothly into or out of port in the most efficient way”. It is assumed that the ship is subject to compulsory pilotage and will use tugboats and linesmen in the process. 

 

Composition of the NAV-team

Directly involved in the safe navigation of the ship are the Bridge Team: A master, OOW(s), crew member(s); The pilot(s): one or more maritime pilots; Tugboat(s) teams; Linesmen teams. Indirect involvement in the safe navigation of the ship is from HCC and VTS, providing information, advice, or instructions. 

From the above, it is clear there is a multi-team, which is self-managed because of various characteristics, such as the autonomy of all teams. The pilot is not part of the bridge team in this structure. Figure 1 shows the architecture of the NAVteam. All communication is depicted by red arrows.  The pilot plays a central role in all forms of communication. 

Characteristics of the NAV-team

As per (Robbins et al., 2017) P.275, there are various characteristics that define a team. To this paper, the characteristics Interests and Duration have been added. 


  1. Goal: To navigate the ship safely and smoothly into or out of port in the most efficient way.
  2. Synergies: Different. The bridge team has specific knowledge about the ship’s equipment, its characteristics, and the layout of various equipment such as mooring layout. The Pilot has specific knowledge on geography, traffic patterns and -density, local procedures and maneuvering with various ships in differing conditions. The tugboat teams are specialized in assisting the ship using tugs, under the direction of the pilot. Linesmen are experts in mooring a vessel in a safe, efficient way. 
  3. Accountability: Different. Each player has different accountabilities. The captain is accountable to the flag state of his ship and the country he visits. Moreover, he is accountable to his employer, company, and charterer. The pilot has no commercial interests; however, he is subject to national laws and pilotage regulations. The Tug Master is subject to his tug’s flag state regulations and his employer, whereas the linesman is accountable to national law and his companies’ regulations. 
  4. Skills: Various, see above “Synergies”.
  5. Interests: Various, both public and private interests play a role in this team.
  6. Duration of the team: The length of the voyage from pilot station to berth, vice versa.

 

Team Effectiveness Model

In  (Robbins et al., 2017), P.279 the team effectiveness model is defined (figure 2). To improve the effectiveness of the NAV-team, all components of this model will be considered.


  1. Context

Adequate resources: Upon boarding the vessel, the pilot and captain determine the voyage plan. Based on the fairway characteristics and the meteorological conditions, the use of tugboats and linesmen will be discussed and determined.  For some categories of ships, the harbor master department stipulates the use of tugboats and linesmen.

Suggestion 1 for improvement: Pilot is to send his proposed voyage plan and planned use of additional services (tugs and linesmen) to the ship and tug and linesmen operator. This may include meteo data to support his advice. This is done to avoid delays in passage time because of lack of resources (Tugs and linesmen)

Leadership and structure: In a multi-team environment as described here, there is not one person or team that can be appointed as leader. When a ship is under pilotage, roles and responsibilities are generally well established. Every team has its own safety- and operational restrictions. A good understanding of these restrictions is needed by all teams, and they should therefore be established before the operation takes place. Every team must respect each other’s position. 

Suggestion 2 for improvement: It should formally be established at what point the captain or the pilot has the conn of the ship.

Climate of trust: The NAV-team is formed on an ad-hoc basis, making it impossible for team members to get to know one another before and after an operation takes place. Mutual trust will therefore mainly be based on perception, reputation, appearance, and professional and personal behavior. 

Suggestion 3 for improvement: Professionalism is the key to success.  Never be unprofessional, whatever the hour of day, or whatever the task may be.

Performance Evaluation and reward system:  Evaluation hardly ever takes place upon completion of a voyage of a ship. Most of the times, pilot, tugs, and linesmen are off to another job very quickly. It would however be beneficial to all players in the process to evaluate a ship’s navigation, especially when problems or unexpected events have arisen. 

Suggestion 4 for improvement: A pilot should initiate the evaluation or debriefing of each voyage with the ship’s master. Whenever needed, tugs masters, linesmen, VTS-operators could be involved as well. This can be done on an informal basis. A just culture must be in place to achieve this. 


  • Composition

Since the NAV-team is created on an ad-hoc basis, the abilities of the team members stem from the reputation, certification, and experience of previous cooperation with these parties. Personalities, and team member preference play a very minor role. Diversity is guaranteed by having experts from the ship, the pilots, tugs, and linesmen available. The size of teams is discussed before the operation between captain and pilot. The finalcomposition of the NAV-team cannot be influenced easily. The nature of the voyage, determined by the ship’s properties and dimensions, the fairway dimensions, the meteorological conditions, the berth layout, and the availability of resources make up the composition of the team. Each team member is dispatched by their own organization to the job at hand on very short notice. E.g., a tugboat operator will dispatch the tug that is most suitable for the job, within the required time frame, fitting into the schedule of the tug. The same goes for linesmen and pilot. 

Suggestion 5 for improvement: Team composition information should be shared between all separate actors to manage the expectations of all involved. This can be done using an electronic means of communication in a port community system.


  • Process

The Common plan and purpose should be clear from the start: to navigate the ship safely and smoothly into or out of port. The specific goals are set for each participating team. E.g., linesmen are to set the mooring lines in cooperation with the ship’s mooring gangs in a specific predefined order. At the same time the tugs are to perform their duties in their own, well-orchestrated manner. These goals should be communicated by VHF in a timely, unambiguous manner. In this way, a shared mental model emerges, which allows all teams and team members to understand their duties well in advance. As a result, possible task conflicts will come up before the operation takes place and can be discussed and resolved. 

Suggestion 6 for improvement: The pilot is to communicate all process details in a concise, unambiguous manner to all teams in a timely manner. Suggestions of all teams should be considered, and possible conflicts should be resolved before an operation takes place. 

References

Robbins, S., Judge, T., & Campbell, T. (2017). Operational behaviour (2nd ed.). Pearson. 

washington.edu. (2021). Team definition. Team Definition P.1. https://courses.washington.edu/ie337/team.pdf

Unlimited License Maritime Pilot, Port of Rotterdam. Pilot ladder safety, active marine pilot - Loodswezen Rotterdam - Rijnmond


Maritime Pilot in port of Rotterdam, Author of www.pilotladdersafety.com
What's your opinion on this?
Login or register to write comments and join the discussion!
Read more...

Opinion Master pilot exchange (MPEX) – share your information

by Gard AS - published on 4 September 2020

The Master and pilot are dependant on each other for a safe and successful beginning or end of a voyage. They are both operating in a foreign environment.

1

Video Maritime Pilot Training V - Pilot Ladder Training

published on 12 May 2021

Training video V on the correct use of the pilot ladder

0

Video Video of Training - Arrangements of embarkation and disembarkation of Practical

published on 6 September 2020

Summary: Important lessons, that they can assist the Practical one, in the best possible way, in the transfer operations.
Found on YouTube. Created by "Praticagem do Brasil".
This video was elaborated by the National Council of Praticagem with the objective of reminding to the masters and sailors, some important lessons, so that they can assist the Practical one, in the best possible way, in the transfer operations.

0

Video Stern-First Method for POD Ships –Practical samples starting with Twin screw followed by POD ships

published on 12 August 2022

Practical samples for manoeuvres for ships going astern - as Stern-First-Method SFM. Introduction using as sample from the Master Thesis by Karel Wiegert for an arrival manoeuvre of a cruise vessel in Southampton port with a Twin-screw vessel under strong current. The same manoeuvre with the same ship model was used to show the advantage of Fast Time Simulation FTS using the SAMMON Planning Tool. This goes much faster than the manoeuvres in the real time simulator - and it can even be...

2

Video Amazing drone video: Berthing a 230m Bulker in Puerto Brisas (Colombia)

published on 5 April 2020

Using two, 66TBP tugs to assist in berthing the 90,000 GT bulker “Jin Weng Feng”. The port is “Puerto Brisas” at La Guajira, Colombia. The vessel is turned to port just outside the berth limits due to limited room in the basin with enough depth. Then she’s backed in.

0

Video Maritime pilot GEMİDE KILAVUZ SEYİRİ

published on 14 August 2025

“Gemide Kılavuzla Seyir | Kaptan ve Kılavuz Arasındaki Kritik İşbirliği (2025 Yönetmeliğiyle)” 📄 YouTube Video Açıklama Metni 🔵 Gemide kılavuz kaptanla seyir nedir? 🔵 Kılavuz kaptan gemiye nasıl çıkar, ne yapar? 🔵 2025 Gemi Adamları ve Kılavuz Kaptanlar Yönetmeliği ne getiriyor? Bu videoda, gemi kaptanı ile kılavuz kaptan arasındaki işbirliğini, liman manevralarının perde arkasını ve mevzuata dayalı zorunlulukları sade ve anlaşılır bir dille anlatıyoruz. Gerçek örneklerle desteklenen bu...

0

Video Handling a mid size container ship

published on 26 June 2020

"Mizar" is a 165 LOA containership, which follows a liner route between the caribbean and the US.
It has a fixed pitch propeller and a bow thruster, which makes it easier to handle. This maneuver consisted of basically just pulling her off the dock and then doing a 160 turn.

0

Article Marine Accident Brief - Collision of Dixie Vandal Tow with Moored Trinity and Tow

by Marine-Pilots.com - published on 8 April 2020

The U.S. National Transportation Safety Board (NTSB) has released a Marine Accident Brief about an accident that occurred in March 2019, involving the towing vessel Dixie Vandal, noting that the BNWAS alarm didn't prevent the fatigued pilot from falling asleep.

0