Article

Improving Teams Performance in Pilotage Waters


by Herman Broers - published on 31 March 2022 -  266 -

Introduction

This paper aims to explore the possibilities of improving team performance on the bridge in pilotage waters. In Bridge Resource Management, the integration of the pilot in the bridge team is an issue open to discussion. In this paper, the pilot will NOT be considered part of the bridge team for several reasons: He is not familiar with the bridge layout, nor is he familiar with the bridge team. Finally, the formal (legal) framework is much different for a pilot than for the captain, officers, and crew of a ship. However, this does not stand in the way of a successful collaboration. The pilot and the bridge team have a common goal: to navigate the ship safely and smoothly.  With the introduction of the term NAVteam, the actual course of events onboard is outlined as it is in practice in pilotage waters. This also opens the possibility of adding the other teams involved in navigating the ship, such as linesmen, port authorities and tugs. They all share the common goal. From the architecture of this multi-team, recommendations are made for optimal functioning by means of a so-called team Effectiveness model.  

The NAV-team

The team involved in navigating a ship will be called NAV-team. A general definition of a team is: A group of people with different skills and different tasks, who work together on a common project, service, or goal with a meshing of functions and mutual support (washington.edu, 2021),P.1.  The goal of the NAVteam can be formulated as follows: “To navigate the ship safely and smoothly into or out of port in the most efficient way”. It is assumed that the ship is subject to compulsory pilotage and will use tugboats and linesmen in the process. 

 

Composition of the NAV-team

Directly involved in the safe navigation of the ship are the Bridge Team: A master, OOW(s), crew member(s); The pilot(s): one or more maritime pilots; Tugboat(s) teams; Linesmen teams. Indirect involvement in the safe navigation of the ship is from HCC and VTS, providing information, advice, or instructions. 

From the above, it is clear there is a multi-team, which is self-managed because of various characteristics, such as the autonomy of all teams. The pilot is not part of the bridge team in this structure. Figure 1 shows the architecture of the NAVteam. All communication is depicted by red arrows.  The pilot plays a central role in all forms of communication. 

Characteristics of the NAV-team

As per (Robbins et al., 2017) P.275, there are various characteristics that define a team. To this paper, the characteristics Interests and Duration have been added. 


  1. Goal: To navigate the ship safely and smoothly into or out of port in the most efficient way.
  2. Synergies: Different. The bridge team has specific knowledge about the ship’s equipment, its characteristics, and the layout of various equipment such as mooring layout. The Pilot has specific knowledge on geography, traffic patterns and -density, local procedures and maneuvering with various ships in differing conditions. The tugboat teams are specialized in assisting the ship using tugs, under the direction of the pilot. Linesmen are experts in mooring a vessel in a safe, efficient way. 
  3. Accountability: Different. Each player has different accountabilities. The captain is accountable to the flag state of his ship and the country he visits. Moreover, he is accountable to his employer, company, and charterer. The pilot has no commercial interests; however, he is subject to national laws and pilotage regulations. The Tug Master is subject to his tug’s flag state regulations and his employer, whereas the linesman is accountable to national law and his companies’ regulations. 
  4. Skills: Various, see above “Synergies”.
  5. Interests: Various, both public and private interests play a role in this team.
  6. Duration of the team: The length of the voyage from pilot station to berth, vice versa.

 

Team Effectiveness Model

In  (Robbins et al., 2017), P.279 the team effectiveness model is defined (figure 2). To improve the effectiveness of the NAV-team, all components of this model will be considered.


  1. Context

Adequate resources: Upon boarding the vessel, the pilot and captain determine the voyage plan. Based on the fairway characteristics and the meteorological conditions, the use of tugboats and linesmen will be discussed and determined.  For some categories of ships, the harbor master department stipulates the use of tugboats and linesmen.

Suggestion 1 for improvement: Pilot is to send his proposed voyage plan and planned use of additional services (tugs and linesmen) to the ship and tug and linesmen operator. This may include meteo data to support his advice. This is done to avoid delays in passage time because of lack of resources (Tugs and linesmen)

Leadership and structure: In a multi-team environment as described here, there is not one person or team that can be appointed as leader. When a ship is under pilotage, roles and responsibilities are generally well established. Every team has its own safety- and operational restrictions. A good understanding of these restrictions is needed by all teams, and they should therefore be established before the operation takes place. Every team must respect each other’s position. 

Suggestion 2 for improvement: It should formally be established at what point the captain or the pilot has the conn of the ship.

Climate of trust: The NAV-team is formed on an ad-hoc basis, making it impossible for team members to get to know one another before and after an operation takes place. Mutual trust will therefore mainly be based on perception, reputation, appearance, and professional and personal behavior. 

Suggestion 3 for improvement: Professionalism is the key to success.  Never be unprofessional, whatever the hour of day, or whatever the task may be.

Performance Evaluation and reward system:  Evaluation hardly ever takes place upon completion of a voyage of a ship. Most of the times, pilot, tugs, and linesmen are off to another job very quickly. It would however be beneficial to all players in the process to evaluate a ship’s navigation, especially when problems or unexpected events have arisen. 

Suggestion 4 for improvement: A pilot should initiate the evaluation or debriefing of each voyage with the ship’s master. Whenever needed, tugs masters, linesmen, VTS-operators could be involved as well. This can be done on an informal basis. A just culture must be in place to achieve this. 


  • Composition

Since the NAV-team is created on an ad-hoc basis, the abilities of the team members stem from the reputation, certification, and experience of previous cooperation with these parties. Personalities, and team member preference play a very minor role. Diversity is guaranteed by having experts from the ship, the pilots, tugs, and linesmen available. The size of teams is discussed before the operation between captain and pilot. The finalcomposition of the NAV-team cannot be influenced easily. The nature of the voyage, determined by the ship’s properties and dimensions, the fairway dimensions, the meteorological conditions, the berth layout, and the availability of resources make up the composition of the team. Each team member is dispatched by their own organization to the job at hand on very short notice. E.g., a tugboat operator will dispatch the tug that is most suitable for the job, within the required time frame, fitting into the schedule of the tug. The same goes for linesmen and pilot. 

Suggestion 5 for improvement: Team composition information should be shared between all separate actors to manage the expectations of all involved. This can be done using an electronic means of communication in a port community system.


  • Process

The Common plan and purpose should be clear from the start: to navigate the ship safely and smoothly into or out of port. The specific goals are set for each participating team. E.g., linesmen are to set the mooring lines in cooperation with the ship’s mooring gangs in a specific predefined order. At the same time the tugs are to perform their duties in their own, well-orchestrated manner. These goals should be communicated by VHF in a timely, unambiguous manner. In this way, a shared mental model emerges, which allows all teams and team members to understand their duties well in advance. As a result, possible task conflicts will come up before the operation takes place and can be discussed and resolved. 

Suggestion 6 for improvement: The pilot is to communicate all process details in a concise, unambiguous manner to all teams in a timely manner. Suggestions of all teams should be considered, and possible conflicts should be resolved before an operation takes place. 

References

Robbins, S., Judge, T., & Campbell, T. (2017). Operational behaviour (2nd ed.). Pearson. 

washington.edu. (2021). Team definition. Team Definition P.1. https://courses.washington.edu/ie337/team.pdf

Unlimited License Maritime Pilot, Port of Rotterdam. Pilot ladder safety, active marine pilot - Loodswezen Rotterdam - Rijnmond


Maritime Pilot in port of Rotterdam, Author of www.pilotladdersafety.com
What's your opinion on this?
Login or register to write comments and join the discussion!
Read more...

Article New book: The Situational Awareness & The Port Pilotage Services

published on 8 February 2021

Serkan Kahraman and Yusuf Zorba have published a new book for marine pilots. In this book, maritime pilots and shipmasters’ situational awareness levels have been analyzed using a bridge simulator system and the results have been obtained.

2

Article London Pilots issue Quick Reference Guide for PTA’s

by Port of London Authority - published on 9 September 2024

London Pilots (PLA) have issued an excellent quick reference guide for Pilot Transfer arrangements, which can be used for pilots as well as ship’s crews. Please take not of this document and if you can, try to incorporate it into your procedures.

1

Video OMC International - Suezmax Tanker - Case Study

published on 14 October 2019

Case Study: An investigation into whether Port of Melbourne and major port user, ExxonMobil, could bring deeper drafted vessels into the channel.

0

Video Kiel Pilots using VR for next-level shiphandling simulation

by Captain, MSc. Remko Fehr - published on 13 December 2023

Kiel Pilots introducing Morild Interaktiv AS Virtual Reality Simulator for next-level manoeuvring training

1

Video How AIS Works - Operation of AIS

published on 30 June 2020

This section should give a short introduction to: Operational aspects of AIS Functions and features Human aspects Key Points The AIS transponder unit. Automatic communication. SOLAS requirements. AIS Information sent by ships. Static information update. MMSI Dynamic information update. Voyage related information update. Checking AIS data. BIIT Display Of AIS data. Recommended AIS symbols. Sleeping target symbol. Activated target symbol. Selected target symbol. Dangerous target...

0

Opinion Fashion Label "Camp David" launches "Sea Pilots" Collection

by Frank Diegel - published on 29 September 2020

The label was developed in 1997 by the company Clinton as a brand of leisurewear for men.

0

Video Maiden voyage of HMM Algeciras #1-Qingdao

published on 5 June 2020

1st 24,000 TEU vessel, 1st Containers loaded, 1st Port call Qingdao

0

Article Pilots sound alarm on proposed federal right whale rules

by Clay Diamond - Executive Director - General Counsel at American Pilots’ Association - published on 1 August 2024

APA says: “Pilots share NOAA’s goal of protecting the North Atlantic right whale, but this is the wrong approach.”

0

Article AIMPA Journal- February 2021 issue VIII

by AIMPA - All India Marine Pilots' Association - published on 17 February 2021

The All India Maritime Pilots' Association has released its new journal for February

1