Article

Improving Teams Performance in Pilotage Waters


by Herman Broers - published on 31 March 2022 266 -

Introduction

This paper aims to explore the possibilities of improving team performance on the bridge in pilotage waters. In Bridge Resource Management, the integration of the pilot in the bridge team is an issue open to discussion. In this paper, the pilot will NOT be considered part of the bridge team for several reasons: He is not familiar with the bridge layout, nor is he familiar with the bridge team. Finally, the formal (legal) framework is much different for a pilot than for the captain, officers, and crew of a ship. However, this does not stand in the way of a successful collaboration. The pilot and the bridge team have a common goal: to navigate the ship safely and smoothly.  With the introduction of the term NAVteam, the actual course of events onboard is outlined as it is in practice in pilotage waters. This also opens the possibility of adding the other teams involved in navigating the ship, such as linesmen, port authorities and tugs. They all share the common goal. From the architecture of this multi-team, recommendations are made for optimal functioning by means of a so-called team Effectiveness model.  

The NAV-team

The team involved in navigating a ship will be called NAV-team. A general definition of a team is: A group of people with different skills and different tasks, who work together on a common project, service, or goal with a meshing of functions and mutual support (washington.edu, 2021),P.1.  The goal of the NAVteam can be formulated as follows: “To navigate the ship safely and smoothly into or out of port in the most efficient way”. It is assumed that the ship is subject to compulsory pilotage and will use tugboats and linesmen in the process. 

 

Composition of the NAV-team

Directly involved in the safe navigation of the ship are the Bridge Team: A master, OOW(s), crew member(s); The pilot(s): one or more maritime pilots; Tugboat(s) teams; Linesmen teams. Indirect involvement in the safe navigation of the ship is from HCC and VTS, providing information, advice, or instructions. 

From the above, it is clear there is a multi-team, which is self-managed because of various characteristics, such as the autonomy of all teams. The pilot is not part of the bridge team in this structure. Figure 1 shows the architecture of the NAVteam. All communication is depicted by red arrows.  The pilot plays a central role in all forms of communication. 

Characteristics of the NAV-team

As per (Robbins et al., 2017) P.275, there are various characteristics that define a team. To this paper, the characteristics Interests and Duration have been added. 


  1. Goal: To navigate the ship safely and smoothly into or out of port in the most efficient way.
  2. Synergies: Different. The bridge team has specific knowledge about the ship’s equipment, its characteristics, and the layout of various equipment such as mooring layout. The Pilot has specific knowledge on geography, traffic patterns and -density, local procedures and maneuvering with various ships in differing conditions. The tugboat teams are specialized in assisting the ship using tugs, under the direction of the pilot. Linesmen are experts in mooring a vessel in a safe, efficient way. 
  3. Accountability: Different. Each player has different accountabilities. The captain is accountable to the flag state of his ship and the country he visits. Moreover, he is accountable to his employer, company, and charterer. The pilot has no commercial interests; however, he is subject to national laws and pilotage regulations. The Tug Master is subject to his tug’s flag state regulations and his employer, whereas the linesman is accountable to national law and his companies’ regulations. 
  4. Skills: Various, see above “Synergies”.
  5. Interests: Various, both public and private interests play a role in this team.
  6. Duration of the team: The length of the voyage from pilot station to berth, vice versa.

 

Team Effectiveness Model

In  (Robbins et al., 2017), P.279 the team effectiveness model is defined (figure 2). To improve the effectiveness of the NAV-team, all components of this model will be considered.


  1. Context

Adequate resources: Upon boarding the vessel, the pilot and captain determine the voyage plan. Based on the fairway characteristics and the meteorological conditions, the use of tugboats and linesmen will be discussed and determined.  For some categories of ships, the harbor master department stipulates the use of tugboats and linesmen.

Suggestion 1 for improvement: Pilot is to send his proposed voyage plan and planned use of additional services (tugs and linesmen) to the ship and tug and linesmen operator. This may include meteo data to support his advice. This is done to avoid delays in passage time because of lack of resources (Tugs and linesmen)

Leadership and structure: In a multi-team environment as described here, there is not one person or team that can be appointed as leader. When a ship is under pilotage, roles and responsibilities are generally well established. Every team has its own safety- and operational restrictions. A good understanding of these restrictions is needed by all teams, and they should therefore be established before the operation takes place. Every team must respect each other’s position. 

Suggestion 2 for improvement: It should formally be established at what point the captain or the pilot has the conn of the ship.

Climate of trust: The NAV-team is formed on an ad-hoc basis, making it impossible for team members to get to know one another before and after an operation takes place. Mutual trust will therefore mainly be based on perception, reputation, appearance, and professional and personal behavior. 

Suggestion 3 for improvement: Professionalism is the key to success.  Never be unprofessional, whatever the hour of day, or whatever the task may be.

Performance Evaluation and reward system:  Evaluation hardly ever takes place upon completion of a voyage of a ship. Most of the times, pilot, tugs, and linesmen are off to another job very quickly. It would however be beneficial to all players in the process to evaluate a ship’s navigation, especially when problems or unexpected events have arisen. 

Suggestion 4 for improvement: A pilot should initiate the evaluation or debriefing of each voyage with the ship’s master. Whenever needed, tugs masters, linesmen, VTS-operators could be involved as well. This can be done on an informal basis. A just culture must be in place to achieve this. 


  • Composition

Since the NAV-team is created on an ad-hoc basis, the abilities of the team members stem from the reputation, certification, and experience of previous cooperation with these parties. Personalities, and team member preference play a very minor role. Diversity is guaranteed by having experts from the ship, the pilots, tugs, and linesmen available. The size of teams is discussed before the operation between captain and pilot. The finalcomposition of the NAV-team cannot be influenced easily. The nature of the voyage, determined by the ship’s properties and dimensions, the fairway dimensions, the meteorological conditions, the berth layout, and the availability of resources make up the composition of the team. Each team member is dispatched by their own organization to the job at hand on very short notice. E.g., a tugboat operator will dispatch the tug that is most suitable for the job, within the required time frame, fitting into the schedule of the tug. The same goes for linesmen and pilot. 

Suggestion 5 for improvement: Team composition information should be shared between all separate actors to manage the expectations of all involved. This can be done using an electronic means of communication in a port community system.


  • Process

The Common plan and purpose should be clear from the start: to navigate the ship safely and smoothly into or out of port. The specific goals are set for each participating team. E.g., linesmen are to set the mooring lines in cooperation with the ship’s mooring gangs in a specific predefined order. At the same time the tugs are to perform their duties in their own, well-orchestrated manner. These goals should be communicated by VHF in a timely, unambiguous manner. In this way, a shared mental model emerges, which allows all teams and team members to understand their duties well in advance. As a result, possible task conflicts will come up before the operation takes place and can be discussed and resolved. 

Suggestion 6 for improvement: The pilot is to communicate all process details in a concise, unambiguous manner to all teams in a timely manner. Suggestions of all teams should be considered, and possible conflicts should be resolved before an operation takes place. 

References

Robbins, S., Judge, T., & Campbell, T. (2017). Operational behaviour (2nd ed.). Pearson. 

washington.edu. (2021). Team definition. Team Definition P.1. https://courses.washington.edu/ie337/team.pdf

Unlimited License Maritime Pilot, Port of Rotterdam. Pilot ladder safety, active marine pilot - Loodswezen Rotterdam - Rijnmond


Maritime Pilot in port of Rotterdam, Author of www.pilotladdersafety.com
What's your opinion on this?
Login or register to write comments and join the discussion!
Read more...

Video S-100 in confined waters: an official IHO testbed and sea trial

published on 27 April 2026

What happens when next-generation maritime data is put to the test in some of the most complex navigational environments? This video shares insights from a major international S-100 simulator trial, delivered in collaboration with Carnival Corporation’s CSMART training facility and a wide network of global partners. Together, we explored how S-100 data sets perform in realistic, high-pressure bridge scenarios—particularly in confined waters where precision and timing are critical. Bringing...

0

Opinion Pilot Ladder - The Weakest Link in Marine Pilotage

by Capt. Santosha K. Nayak - published on 10 August 2020

Pilot transfer arrangement is a sensitive topic to be discussed among the pilot’s fraternity. Although ships are designed and operated with compliance to the SOLAS requirements in all respects including the pilot transfer arrangements, there has been numerous deficiencies observed related to pilot transfer arrangements. The small deficiencies from the part of ships cause life threatening accidents for pilots and sometimes to the ship staff themselves. There are many instances of defective ladder and complacency in proper rigging of ladders has been reported almost every day in different parts of the world. Many pilots lost their life, severely injured for life and face many minor to major accidents. The latest incident being the Capt. Timothy Murray of Sandy hooks Pilot.

3

Article Webinar - Port & Pilot supplied ECDIS routes and passage plans

published on 29 January 2021

The Australasian Marine Pilots Institute is presenting a webinar via Zoom about ports providing ECDIS routes and passage plans to ships as part of the pre-arrival process.

It will take place on Thursday 11 February 2021 at 19:00 AEDT (08:00 UTC) and is free for AMPI/IMPA/UKMPA/NZMPA members. Non-members are also welcome to attend.

2

Article Furetank (Sweden) turns former office into advanced ship simulator training centre

published on 7 February 2023

Furetank turns a former office building into a maritime educational centre on Donsö outside Gothenburg: a state-of-the-art ship simulator complex for training, assessment and certification.

0

Video Port Ash Australia: Ship Handling Training & Research Centre

published on 28 January 2022

RINA ACT Technical Meeting
23 November 2021
Port Ash Australia: Ship Handling Training & Research Centre
By A. Beazley, Port Ash, Australia

1

Article Evergreen Shipping’s new world record megamax arrives at Port of Taipei (incl. video)

published on 12 August 2021

Evergreen Shipping’s new 24,000 TEU container ship EVER ACE arrived at the Port of Taipei for the first time today, August 8, breaking a record for the largest ship by tonnage to dock at the port.

0

Video Pilot boat of Berbera

published on 3 February 2024

0

Video Virtual Reality Example INGEMAR Naval Architects

published on 26 May 2020

How our Virtual Reality (VR DESIGN) software workd.

0